ENDEL

Creation of the Sagit’R interface interface in mvp for Endel

Our work

Context

How endel managed to optimise the management of traceability information and production information?

Sagit’R is the Advanced Solution for Traceability and Realization Information Management. It is a “site” oriented business tool dedicated to its targets. The main needs of the project and the requirements of the specifications are oriented towards the control of the scope, the management of the traceability of materials and production as well as the management of all the power plant construction projects.

DELIVERABLES

  • 107 UX models
  • 137 UI models
  • 1 Design system
  • 1 logo
  • 1 Site map (all pages and variations of the tool)
  • 1 animated prototype of the models

CUSTOMER BENEFITS/ RESULTS (FIGURES)

Creation of a functional traceability tool that is optimised and meets the needs of users

  • 19 MVP features
  • 1 month of UX research/creation backlog/feature prioritisation/
  • 5 months of UX-UI design
  • 2 sprints (2 weeks/sprint) project scoping, user requirements definition and backlog creation.
 

Project

How to optimise the management of traceability information and implementation information on a project?

The real challenge during this project was to understand and learn the different jobs (method preparer, welding engineer, quality controller, PMO, site managers and site supervisor) To do this, we conducted user interviews to understand and identify user needs.

By designing a “site” oriented business tool to ensure the centralisation of data related to a project, their authenticity and priority, and their processing. The interface offers a visualisation of the progress of the project, the items that make it up, their origin, the interventions of the business actors and their skills. Finally, the measurement of efficiency allows the analysis of the outcome and performance of the project.

 

 

FEATURES IMPLEMENTED FOR THIS BUSINESS TOOL

  1. Creating & archiving a project
  2. Importing and creating project data
  3. Definition of the scope
  4. Creation of control law matrices
  5. Construction of the welding reference system
  6. Creation of the stakeholder base and metrology base
  7. Ensure quality monitoring of assemblies and controls
  8. Analysing the results and performance of a project

Skills and Roles

  • 1 Lead UX Designer
  • 1 UX Designer
  • 1 UX/UI Designer
  • 1 Product Owner
  • 6 Developers
  • 1 Development Area Manager – Business ISD

Technical Frameworks

  • Zeplin
  • Realtimeboard
  • Illustrator
  • Adobe XD